Scheduled updates

A scheduled update re-checks a report on a fixed cycle. If the data has changed, it re-aggregates the numbers and saves them as the next version of that report.

Setting one up

Set it up from the bottom of the report. There are three settings:

  • Repeat: every month, or every three months
  • Day: from the 1st to the 28th (the 29th to the 31st are left out because some months do not have them)
  • Time: on the hour, Japan time

The check reuses the report's own request and plan. There is no separate instruction to write.

What happens at each check

  • If the data has been updated, the numbers are re-aggregated and saved as the next version of the report.
  • Even when nothing has changed, the time of the check and the data version are recorded in the history.
  • Only when the numbers change does the AI write a summary of the changes, measured against your original question. This counts toward your organization's monthly limit (Pricing and usage).

Depending on the data a report uses, little may change over the cycle you chose. The Schedules page tells you so; most checks will then find no change.

The Schedules page

The Schedules page, opened from the menu on the left, lists the reports you have on a schedule, with the next check, the cycle and the last result.

Open one to:

  • Check now: re-check immediately instead of waiting for the next run.
  • Edit: change the cycle, day or time. The check history is kept.
  • Pause and Resume
  • Delete: future checks stop and the check history is deleted. The report itself is not deleted.

The check history lists each check's time, whether it was scheduled or manual, and the result (no change, updated, or stopped). Checks where the numbers changed come with the summary of changes and a link to the updated report.